West Contacts | East Contacts | Subscribe | Advertise | Login | Register | Advertiser Index | Facebook | Google
MSA Professional Services delivered a 36-page river wall rehabilitation study and cost estimates to the New London Public Works Committee. Located downtown on the north side of the Wolf River, the wall was constructed in the 1920s.  It is in need of major structural repair.
MSA Professional Services delivered a 36-page river wall rehabilitation study and cost estimates to the New London Public Works Committee. Located downtown on the north side of the Wolf River, the wall was constructed in the 1920s. It is in need of major structural repair.
Thursday, April 09, 2015 11:56 AM
New London considers bond issue
© www.waupacanow.com. All rights reserved. | Privacy Policy/Your Californial Privacy Rights | Terms of Use | Living
 
© Copyright Multi Media Channels LLC 2014. All Rights Reserved. No part of this website or any of its contents may be reproduced, copied, modified, or adapted without the prior written consent of Multi Media Channels LLC.
 
600 Industrial Dr., Waupaca, WI 54981 | 715.258.3207